Imam Reza mechanized parking

Imam Reza mechanized parking project, which is one of the major projects of Mashhad and Optimpark in the field of mechanized parking, was started in 2021 based on the contract concluded between the Holy Mashhad Municipality and Optimpark company.

This parking lot is a type of Pallet-less mechanized parking system which consists of 4 parking modules (two modules with a capacity of 30 parking spaces and two modules with a capacity of 40 parking spaces) and according to the plans made, It will be operational by the end of 2022.

The modules used in this parking lot have been designed and implemented in such a way that it is possible to park all kinds of passenger cars in different classes (including long chassis, semi-chassis and sedan).

Indicative features of this type of mechanized parking are the ability to cover the facade, the ability to install fire alarm and extinguishing system, optimal use of available space to provide a large number of parking places, the ability to install a turntable inside the system and the possibility of using different entrance methods (manual, automatic, dedicated card, fingerprint, app and barcode reader).

Imam Reza mechanized elevator parking

Imam Reza mechanized parking location

Imam Reza mechanized parking gallery